PROJECT ATOM


Work: Heavy Industrial
Date: Oct 2014 – Nov 2015

Client: New Zealand Steel Ltd 

Project Atom consisted of the installation of a new 4 strain Billet Caster and Ladle Metallurgy Furnace with an overall project budget of $56 Million. 

As the head civil contractor we successfully undertook all forms of the build from:

  • Extensive demolition of the existing concrete floors and

    foundations

  • Excavation and prep for building works

  • Piling

  • Sheet piling

  • Concrete foundations and floor slabs

  • Large concrete support columns

  • Construction of 10m high in situ concrete Billet Caster

  • Construction of multiple masonry/concrete Transformer,

    Hydraulic, Electrical and Control Rooms

  • Cooling Tower bunds

  • Large scale roof replacement to Steel Plant

  • Further enabling works 